Construction of Robotic Observatory - 7, Dome making I
Dear ATMers,
After months and months of waiting we finally got started at the real big thing. The construction of the dome was started up at 0900 hrs sharp this morning ( Saturday ) and things were kept running rather smoothly.
Before dusk the wall panels of the dome was all completed and the two hemispherical doom halves was also assembled.
As the sun started to sink below horizon we had to put a halt on the work. Final assemble will be carried out tomorrow Sunday.
Best regards
Chan Yuk Lun
7th February 2009
After months and months of waiting we finally got started at the real big thing. The construction of the dome was started up at 0900 hrs sharp this morning ( Saturday ) and things were kept running rather smoothly.
Before dusk the wall panels of the dome was all completed and the two hemispherical doom halves was also assembled.
As the sun started to sink below horizon we had to put a halt on the work. Final assemble will be carried out tomorrow Sunday.
Best regards
Chan Yuk Lun
7th February 2009
- 附加檔案
-
- Wall panels. You can see the pulleys for supporting the weight and providing free rotation of the dome.
- 23.jpg (76.22 KiB) 已瀏覽 12294 次
-
- Putting up the skirt plate – this is used to protect against rain from leaking into the inside of the dome.
- 22.jpg (81.25 KiB) 已瀏覽 12294 次
-
- Before starting of job it is essential to mark the position of door way first.
- 21.jpg (80.72 KiB) 已瀏覽 12294 次
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
more pictures...
- 附加檔案
-
- Drilling 28 holes for the foundation bolts. Hard job !!
- 31.jpg (102.52 KiB) 已瀏覽 12274 次
-
- A very very special ( at astronomical price ) hydraulic drill for drilling the foundation holes for the bolts.
- 30.jpg (78.76 KiB) 已瀏覽 12274 次
-
- After putting all the wall panels into place we must check for true roundness by a long diameter bar before drilling of foundation bolts.
- 29.jpg (78.42 KiB) 已瀏覽 12274 次
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
Dear Mr. So,Eddy So 寫:請問此圓頂位置在那裡?Chanlunlun 寫:Dear Mr. BingSze,bingsze 寫:你的熱誠和才華令人十分佩服!
鏡神,你好野!
Thank you, I am flattered.
Please be reminded that I'm just another ordinary man trying to offer some effort in promoting astronomy in HK.
Best regards
Chan Yuk Lun