C記80ED VS 國產80APO
- david_kmng
- 白矮星
- 文章: 960
- 註冊時間: 週五 11 7月, 2003 00:10
- 來自: 草根階層
-
- 超新星
- 文章: 2
- 註冊時間: 週五 02 8月, 2019 07:29
C記80ED VS 國產80APO
Hello All,
We maintain Routes in ECC Table TVRO. Certain of our materials are set up Due to use of APO Product Allocations to perform the GATP Check and Scheduling Lines over in APO. FOr that reason we are using /n/SAPCND/AU12 Change Scheduling Step for Condition Type TRAN to maintain our Routes in APO also. Days in ECC and Hours in APO. Right now it is a manual process to ensure that the corresponding route exists in both systems. My question is, is there a way for the system to automatically keep these in sync?
Many Thanks
We maintain Routes in ECC Table TVRO. Certain of our materials are set up Due to use of APO Product Allocations to perform the GATP Check and Scheduling Lines over in APO. FOr that reason we are using /n/SAPCND/AU12 Change Scheduling Step for Condition Type TRAN to maintain our Routes in APO also. Days in ECC and Hours in APO. Right now it is a manual process to ensure that the corresponding route exists in both systems. My question is, is there a way for the system to automatically keep these in sync?
Many Thanks
誰在線上
正在瀏覽這個版面的使用者:沒有註冊會員 和 19 位訪客